I last left you with something like this:


Not much! Here I'll give you the very abbreviated version of how we carried out our plans to put in recessed lights, his and hers medicine cabinets with outlets, and a pretty pocket door, all to prepare us for putting up our walls.

First in the doorway, we needed to make sure our 3rd floor was supported. Our best friend Home Depot sells these metal half-studs made for pocket doors, and we also placed a cross beam to keep elevated all that was supposed to be. Some extra vertical studs further back in the wall reinforced everything. We could then slide the track in and hang the door.


So pretty! Plus, it would make this mini master seem much larger.

We then moved on to our recessed lights, which pretty much just required precise measurements, hole-drilling for the wires, and some forethought. We knew we'd need wires for our medicine cabinets, so we worked that in at the same time. 


We did these medicine cabinets totally "Harry homeowner" style, but don't laugh. It wasn't worth it to spend $400 each on two new ones with outlets, so we made it work with what we had. With it all done now, you can't even tell that we just sawed a hole in the top and shoved an outlet in!


This bathroom backs up directly to what will soon be our kids' bathroom. They were complete mirror images of each other, meaning that the toilet backs right up to toilet, and the shower backs right up to shower. We really wanted to avoid being able to hear someone else pee, so we added some insulation between the walls to give us a bit of soundproofing.


So now we are ready for drywall! We first worked our way down the walls, excluding the shower, and then popped up the ceiling. More on the shower later. Then, we mudded the millions of screws and seams, which is honestly my least favorite part of all. And just like that, we were ready for some finishing touches.


The cabinet transport only gave me a few panic attacks, which you may find understandable when seeing how our incredibly expensive cabinets were strapped to the back of Adam's truck and then driven the 15 minutes at 60 mph on the highway to get them to our parking spot. SO SCARY, but everybody and thing made it safely.


We brought those bad boys upstairs, installed them, and then promptly covered them so as not to mess them up. Aren't they pretty?? 

We primed the walls and ceiling to give the illusion of a nice bathroom, even though there was still a LOT of work to do. At this point, we are ignoring the big hole where the shower should be.
 

Which brings us to a pretty solid stopping place. Next time, I'll tell you all about the whole shower process. It's a doozy!

Sunday, September 18, 2016

Master Bathroom


This post has been a long time coming! When looking back, we officially started this renovation on December 27, 2015 and finished on September 3rd, 2016. Of course, we were also in the process of renovating our whole master bedroom and loft, which was an enormous undertaking, so we didn't actually start to focus on the bathroom until March. With that said, here's our Master Bathroom Renovation!!

Our before photos are pretty weak, but you'll get the idea: all beige with a shower/tub combo, pink curtain rod, and a door taking up the majority. Not well pictured are the beat up cabinets and the two 6 inch bump outs that were built to make the cabinet and tub standard sized. Not super disgusting, but an overall blah.


We knew when we started renovating the house that this bathroom would happen at some point. Our grand plan was to extend the square footage by removing those wasteful bump outs, put in a pocket door to make the space seem bigger, and convert the tub into a standing shower. Since there were already his and hers sinks, we wanted to add an additional medicine cabinet for some extra storage. Finally, on top of all that, we wanted to put in recessed lights to again give the illusion of space.

So since the bathroom was definitely in the plans, while we were ripping out things in our loft, we just went ahead and tore out all this, too. Evvvverything about it.


We started with the wasteful bump-outs, hoping to gain a few inches in space by ripping them out. Then we checked behind the mirror to figure out where electric was and see if we needed to totally demolish all walls to get our lights in place. The answer was yes. Womp womp.


 Next came tile demolition, with assistance from the always-helpful Sara (hi and thank you, Sara!!).




Good lookin stuff right here.

Adam and I then pulled out the rest of the walls, the tile floor, and the bathtub to see what remained.  


After a significant amount of cleanup, here's what we had:


 This hole would be our new standing shower, minus the space of the framed bump-out, though a very long time from now. Keep in mind, it is still December here. 

Our next task was the door frame and adjacent wall, so as to make room for our pocket door. The key was to carefully yank out studs without ripping out the drywall in our closet (much). Success!


And with that, we were left with no walls, no floor, a bedroom full of trash, and one crappy light. Honorable mention to that glorious $10 light fixture though...


Next time, on to the electric and reconstruction!